Projet808 Royal
Adresse808 Royal Ave, New Westminster, BC, Canada
Surintendant du siteKnifer Mangaoile
Entrepreneur généralGraham Construction
10909 calgary AB T2Z 3V9 CANADA
Commentaires

Welding was being performed using the SMAW process to anchor staircases in an apartment building under construction.

Warlock Metalworks Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 3 and has been sublet the work by Marcon Metalfab Inc. who is certified in Division 2, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteKnifer Mangaoile
Représentant de la CWBSean Mulleady
Date2026-07-30